The DCL high volume manufacturing plant is structured around meeting the needs of vehicle and engine OEMs for off-road industrial vehicles, and can meet yearly volume demands of 100 to 100,000 units for a number of unique designs simultaneously.
Catalytic converter and muffler components are assembled in a synchronous one-piece flow for all work cells. Kanban bins link fabrication and assembly cells. The production schedule is determined by demand based level loading, minimizing on-hand inventory of parts. |